2016: That ’70s Canoe
Our 2016 canoe featured an innovative new concrete layering technique, graphics created entirely via cast-in-place and precast colored concrete, and an ambitious project management plan that included the execution of a full-scale practice canoe in the fall semester.
- Concrete test cylinders and composite slabs for lightweight concrete slab assembly testing.
- Colored concrete flower petal tiles are cut and cast a few days before pour day.
- Team members place colored structural concrete in a tie-dye pattern for the bottom layer (outside) of the canoe.
- Precast colored concrete tiles are laid out in a rainbow peace sign, ready to be grouted into place at the end of pour day.
- Co-Captains Erin and Karina with the canoe and section on display at PSWC
- Placing the canoe into the water for the first time!
- Co-ed Sprint
- Team members Tyler and Cole during the men’s endurance race